摘要
成渝高速铁路沙坪坝站位于重庆市沙坪坝区核心地带,是沙坪坝综合交通枢纽的重要组成部分,主要服务于成都和重庆之间公务、商务、旅游及探亲出行。以沙坪坝站出站人流为研究对象,利用Legion行人仿真技术对铁路出站通道2种闸机布设方案进行比选,结合仿真结果和实际运营特点,提出沙坪坝站出站通道中的设施设备规模、布局及运营中需要重点留意的人流聚集冲突点等建议,为后期沙坪坝站出站通道施工、运营及类似铁路客运站出站通道的设计提供参考。
Lying in the core area of the district, Shapingba high-speed railway station is the main part of Shapingba comprehensive transportation hub and mainly serves for various business and leisure time trips of passengers between Chengdu and Chongqing. This paper utilizes Legion software to simulate the outbound passenger flow in Shapingba railway station, and mainly compares two different gate layout schemes in outbound tunnel. Meanwhile, combined with the simulation results and operation characteristics analysis in the real environment, the paper puts forward suggestions about the scale and layout scheme of facilities and equipment in the outbound tunnel of Shapingba station, and points out the conflict points of passenger streams which need to be cautioned in-daily operation so as to provide reference for the construction and operation of Shapingba high-speed railway station in the future, as well as for the design of similar outbound tunnels for other railway stations.
出处
《铁道运输与经济》
北大核心
2016年第9期50-55,共6页
Railway Transport and Economy
基金
重庆市应用开发计划项目(2015H01373)
中央高校基本科研业务费专项资金资助项目(2682015CX041)
关键词
Legion软件
行人仿真
铁路客运站
出站通道
设施设备
Legion
Pedestrian Simulation
Railway Passenger Station
Outbound Tunnel
Facilities and Equipment