以多因素模糊矩阵算法和仿真技术理论为基础,从我国建筑工程风险的特点及实际情况出发,探讨大型工程领域存在的风险.对多因素模糊矩阵算法在建设工程风险评价中的适用性进行分析,并以某省大型粮仓储备工程建设风险评价为例,进行工程仿真诊断.结果表明:该算法量化程度高,可操作性强.
Based on the theory of multi-factor fuzzy matrix algorithm and simulation technology,the characteristics and the actual situation of Chinese construction project risk were discussed,the risks in the current large scale engineering field were studied.The applicability of multi-factor fuzzy matrix method in the risk assessment of construction project was analyzed,and a large granary reserve construction risk assessment was taken as an example for the engineering simulation diagnosis.The result shows that the algorithm has high degree of quantization and good operability.
出处
《华侨大学学报(自然科学版)》
CAS
北大核心
2016年第5期591-594,共4页
Journal of Huaqiao University(Natural Science)
基金
全国统计科学研究计划项目(2013LY127)
关键词
建设工程
风险等级
仿真诊断
风险评价
多因素模糊矩阵算法
construction project
risk grade
simulation diagnosis
risk assessment
multi-factor fuzzy matrix algorithm