期刊文献+

计及风速和负荷特性的风火打捆发电系统规划 被引量:11

Optimal Planning of Bundled Wind-thermal Generation Power Systems Considering Wind Speed and Load Characteristics
下载PDF
导出
摘要 风火电打捆是解决能源基地电力外送的有效手段。提出一种计及风速和负荷特性的风火电打捆发电系统优化规划方法。根据送端系统风速和受端系统负荷特性,建立打捆发电系统分段波动输送功率模型。以打捆发电系统在规划期内单位发电成本为优化目标函数,计及风电场拟规划区间约束和打捆发电系统运行约束,构建了风火电打捆发电系统优化规划模型。模型采用模拟退火算法求解,并通过算例分析证明所述方法的有效性。 The development of bundled wind-thermal generation systems(BWTGSs)is an effective way to transmit the power generated by energy bases.A method for the optimal planning of BWTGSs is proposed.By taking the wind speed of wind farm and the load characteristics of the receiving power system into account,a sectionalized and range-fluctuated power transmission model is formulated.By using the unit generation cost of BWTGS in the planning time frame as the objective function,planned capacity range of wind power and operation restrictions of the bundled system as the constraints,an optimal planning model is developed.The simulated annealing algorithm is employed to solve the model and numerical test verifies the effectiveness of the proposed method.
出处 《电力系统自动化》 EI CSCD 北大核心 2016年第15期59-66,共8页 Automation of Electric Power Systems
基金 国家自然科学基金资助项目(51377178) 重庆市研究生科研创新项目(CYB14037) 中国南方电网有限责任公司科技项目(K-GZ2013-468)~~
关键词 风火电打捆发电系统 电力系统规划 分段波动输送功率模型 模拟退火算法 bundled wind-thermal generation power system power system planning sectionalized and range-fluctuated power transmission model simulated annealing algorithm
  • 相关文献

参考文献24

二级参考文献283

共引文献1812

同被引文献264

引证文献11

二级引证文献117

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部