基于BIM技术的进度预测在工程中的应用 被引量:10

APPLICATION OF BIM BASED SCHEDULE FORECAST IN COMPLEX PROJECT
下载PDF
导出
摘要 进度管理的目的是控制和节约时间,但传统进度计划编制依据资料较多,实施较被动,不能提前采取预防措施,效率较低,应用方法及工具较抽象,信息表达不全面;无法实现动态表达。而运用BIM可为建设项目施工阶段提供全面、准确的数据支持,可建三维模型,可预见错漏碰缺等问题,实现事中控制。南京青奥体育场馆即构建了基于BIM的进度管理整体框架体系,提出基于BIM技术的施工组织进度安排,解决施工难点,减少返工,节约成本。 The purpose of schedule management is to control and save time, but traditional schedules have various disadvantages, such as passive implementation, having no prevention measure, low efficiency, abstract method and tools, insufficient information expression and having no dynamic expression, etc. BIM technique could provide overall and accurate data support for engineering construction, establish three- dimensional model, forecast error, omission, conflict and defect, and realize intermediate control. In Nanjing Youth Olympic Stadium project, frame system of BIM-based schedule management was established. BIM- based construction organization and schedule arrangement were proposed to solve the difficulties in construction, reduce reworking and save construction cost.
出处 《建筑技术》 北大核心 2016年第8期683-685,共3页 Architecture Technology
基金 江苏省普通高校研究生实践创新计划项目(SJLX-0472)
关键词 BIM 4D模拟 进度预测 BIM 4D simulation schedule forecast
  • 相关文献

参考文献7

二级参考文献36

  • 1张建平,曹铭,张洋.基于IFC标准和工程信息模型的建筑施工4D管理系统[J].工程力学,2005,22(S1):220-227. 被引量:108
  • 2过俊.BIM在国内建筑全生命周期的典型应用[J].建筑技艺,2011(1):95-99. 被引量:141
  • 3李永奎,乐云,何清华.BLM集成模型研究[J].山东建筑大学学报,2006,21(6):544-548. 被引量:25
  • 4Project Management Institute. A guide to the project management body of knowledge (4th edition)[Z]. Newtown Square, PA: Project Management Institute, 2008. 被引量:1
  • 5Lipke W, et al. Prediction of project outcome the application of statistical methods to earned value management and earned schedule performance indexes[J]. International Journal of Project Management, 2009,27 : 400-407. 被引量:1
  • 6Fleming Q W, Koppelman J M. Earned value project management (3rd Ed. ) [Z]. Newtown Square, PA : Project Management Institute ,Inc. ,2006. 被引量:1
  • 7Anbari F T. Earned value method and extensions [J]. Project Management Journal, 2003,34 (4) : 12. 被引量:1
  • 8Jacob D. Forecasting project schedule completion with earned value metrics[J]. The Measurable News, 2003, (March) : 7 - 9. 被引量:1
  • 9Jacob D S, Kane M. Forecasting schedule completion using earned value metrics revisited[J]. The Measurable News,2004, (Summer) : 7-11. 被引量:1
  • 10何荚培,葛文兰.BIM第二维度一项日不同利益相关者的BIM应用[M].北京:中国建筑工业出版社.2011:147-149. 被引量:1

共引文献89

同被引文献79

引证文献10

二级引证文献93

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部