通过现场施工,总结出灌注桩后注浆技术的作用机理以及施工时管道安装、注浆作业、问题处理等现场技术控制要点,为确保桩基施工达到既定的质量、进度、安全等目标创造有利条件,并为以后相关施工作业总结经验。
Through the construction site, the mechanism of the effect of cast-in-place pile with post grouting technology are summarized, and construction of pipeline installation and grouting operations, processing of on-site technical control points, to ensure that the pile foundation construction to established quality, progress, safety and create favorable conditions and after related construction work exoerience.
出处
《建筑技术开发》
2016年第7期90-90,104,共2页
Building Technology Development
关键词
桩基
水泥浆
注浆量
注浆压力
pile foundation
cement slurry
grouting
grouting pressure