7Li Wenyuan,Korczyuski J.A reliability-based approach to transmission maintenance planning and its application in BC hydro system[J].IEEE Trans on Power Delivery,2004,19(1):303-308. 被引量:1
8Marwali M K C,Shahidehpour S M.Short-term transmission line maintenance scheduling in a deregulated system[J].IEEE Trans on Power Systems,2000,15(3):1117-1124. 被引量:1
9Sharkh M Y E,Keib A A E.Maintenance scheduling of generation and transmission systems using fuzzy evolutionary programming[J].IEEE Trans on Power System,2003,18(2):862-866. 被引量:1
10Sawa T,Furukawa T,Nomoto M,et al.Automatic scheduling method using Tabu search for maintenance outage tasks of transmission and substation system with network constraints[C].Power Engineering Society 1999 Winter Meeting,NewYork,USA,1999. 被引量:1