摘要
文章基于160 km/h电力机车项目低压柜布线工艺,提出一种系统解决传统低压柜布线工艺不足的优化方案——预布线,并从工艺方案、实施过程、实施效果、难点预控等方面进行分析。
Based on the wiring technique of low-voltage cabinets for 160 km/h electric locomotive, the paper puts forward an optimization plan--pre-wiring, in order to solve the deficiency of traditional wiring technique for low-voltage cabinets. It also analyzes the technology plan, implementation process, implementation effect, difficulty of pre-control.
出处
《电力机车与城轨车辆》
2016年第4期66-68,89,共4页
Electric Locomotives & Mass Transit Vehicles
关键词
电力机车
传统布线工艺
低压柜
预布线
electric locomotive
traditional wiring technique
low-voltage cabinet
pre-wiring