摘要
采空区复采巷道的掘进一般围岩较破碎,需要先把前探钢钎插入掘进工作面内,再进行装药、爆破等工作,确认安全后,铺设联顶网,使用液压支柱配合长木料将顶网顶起,然后移前探梁,放棚梁,再出煤(矸),栽棚腿,以此为一个巷道掘进循环。在掘进工程的探索中,发明了一种采空区复采破碎围岩掘进超前支护装置,保证了掘进工作面爆破掘进时顶板的完整性,缩短了采空区复采巷道掘进的时间。
Goaf roadway drivage mining, surrounding rock broken, so need to take the former steel in tunneling working face, and then to charge and blasting work, after confirmed safe, laid landing net, will use hydraulic prop with long wood top jacking, and then move the ground beam before, put a tent to beam, the coal (bottles) and then planted tent leg, as a roadway drivage cycle.At the same time, developed a goaf mining are broken surrounding rock tunneling advance supporting device, ensure the integrity of the main roof during the blasting excavation tunneling faces, shortens the time of mining roadway drivage of mined-out area.
出处
《山东煤炭科技》
2016年第7期47-49,共3页
Shandong Coal Science and Technology
关键词
采空区
复采
巷道掘进
顶板
goal repeated mining roadway drivage roof