洛阳水闸加固工程导流围堰方案优化与施工 被引量:4

Scheme optimization and construction of river diversion cofferdam for Luoyang Sluice Reinforcement Project
下载PDF
导出
摘要 针对泉州市洛阳水闸除险加固工程原导流围堰设计方案存在的问题,通过优化,上游采用充灌砂袋围堰,创造干地施工条件,彻底修复了洛阳水闸工程水平与垂直防渗设施,与原设计导流方案比较,施工质量、工期及防洪度汛得到保障,且降低工程造价,确保了水闸除险加固效果。 In view of the problem existing in the original diversion cofferdam design scheme of Luoyang Sluice Reinforcement Project, design optimization was conducted. Upstream cofferdam was constructed with filling sand bags, so as to create dry construction condition for the the horizontal and vertical anti-seepage facilities of Luoyang sluice to be thoroughly repaired. Compared with the original diversion scheme, the optimized scheme guaranteed the construction quality and period as well as flood prevention at less cost.
作者 黄素清
出处 《广西水利水电》 2016年第3期48-50,共3页 Guangxi Water Resources & Hydropower Engineering
关键词 导流围堰 方案 优化 充灌砂袋 施工 River diversion cofferdam scheme optimization filling sand bag construction
  • 相关文献

同被引文献16

引证文献4

二级引证文献17

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部