摘要
为了检验徐家湾连续刚构渡槽箱梁的安全性能,经过近42天5级加载充水试验,监测结果表明:徐家湾渡槽箱梁竖向位移与设计理论值一致,渡槽施工质量良好,结构安全。其成果可供类似连续刚构渡槽充水试验参考。
In order to check the safety of box girder of Xujiawan continuous rigid aqueduct, 5-grade loading water filling test was conducted for nearly 45 days. The results of monitoring demonstrate the vertical displacement is identical with the design value, the construction quality is good, and the structure is safe. The results also can be reference for water filling test of similar rigid aqueduct.
出处
《广西水利水电》
2016年第3期12-14,共3页
Guangxi Water Resources & Hydropower Engineering
关键词
连续刚构渡槽
充水试验
竖向位移
监测
Continuous rigid aqueduct
water filling test
vertical displacement
monitoring