摘要
介绍了信息机房工程整体设计及施工的优势,并结合天津机场二期扩建机房工程,阐述了机场运行指挥中心及功能中心区域、弱电信息机房的整体设计及施工。提出航站楼建设中信息机房的整体设计及施工能最大限度减少因变更导致的工期延误、成本增加、现场协调、拆改返工等问题,为航站楼整个弱电系统进驻机房和功能中心安装调试节省了时间。
This paper introduced the advantages of integral design and integral construction of information room in terminal construction project. Combining by second stage expansion computer project of Tianjin airport,the integral design and integral construction of airport operation center and functional center areas were elaborated. It is pointed out that the design and integral construction of information room can maximize the problems including construction period delay,cost increase,field coordinating and rework cost,which save the time of installation and debugging when whole weak-current system is stationed in information room and functional center in terminal building.
出处
《现代建筑电气》
2016年第6期6-8,14,共4页
Modern Architecture Electric
关键词
航站楼
智能化系统
信息机房
整体设计
整体施工
terminal
intelligent system
information room
integral design
integral construction