摘要
石家庄新客站东广场地下土建工程结构施工中部分区域属高大模板工程,设计高支模框架柱模板,并进行验算,计算结果表明设计方案是可行。工程实践表明所采用的模板方案和施工工艺是合理的,保证工程的顺利进行。
The construction of civil works under the east square of Shijiazhuang New Station is high and large formwork engineering. The formwork of frame column was designed. By checking the strength and stiffness of formwork, the article verifies the feasibility of the design scheme. The project's practice shows that the formwork design and construction process are reasonable and has ensured the smooth practice of the project.
出处
《石家庄铁路职业技术学院学报》
2016年第2期34-38,共5页
Journal of Shijiazhuang Institute of Railway Technology
关键词
模版
框架柱
施工
地下工程
formwork frame column construction underground engineering