摘要
某金矿选矿厂在尾矿浓密机底流矿浆输送中,通过精确的工程计算,充分利用设备高差,用空气提升代替传统的渣浆泵输送,有效地减少了系统电耗和维修成本,对类似矿山具有借鉴意义。
Through accurate calculation and making full use of the height difference of equipments,using air lift replaced the pump in the transport of tailings thickener underflow of a gold concentrator,which reduced the power consumption and maintenance cost effectively.This technique has reference meaning to the similar mines.
出处
《中国矿山工程》
2016年第3期29-31,共3页
China Mine Engineering
关键词
空气提升
提升高度
沉没深度
电耗
air lift
lifting height
sinking depth
power consumption