摘要
上海黄浦江下正在计划建设9座新的越江隧道。管线改造规划方案也往往成为影响越江隧道工程安全、工程投资、工程进度和工程方案的重要因素。结合正在建设的周家嘴路越江隧道工程,介绍了越江隧道工程市政管线改造方案,有关经验可供相关专业人员参考。
There are nine new cross-river tunnels planning to construct under Huangpu River of Shanghai.The pipeline reconstruction planning scheme often becomes the important factor to affect the safety,engineering investment, engineering schedule and engineering scheme of cross-river tunnel. The article introduces the reconstruction scheme of municipal pipelines in the cross-river tunnel project. The relative experience can be referred for the similar projects.
出处
《城市道桥与防洪》
2016年第6期172-174,共3页
Urban Roads Bridges & Flood Control
关键词
越江隧道
市政管线
改造
cross-river tunnel
municipal pipeline
reconstruction