期刊文献+

考虑乘客需求特性的DRC公交运行周期优化 被引量:3

DRC bus operation cycle optimization corresponding to passenger demand characters
下载PDF
导出
摘要 考虑乘客需求特征,构建了单车双周期运行模式下DRC运行周期的优化方法。首先刻画乘客需求特征,然后根据出行分布的不均匀性、乘客取消预订等构建乘客出行成本函数,并与运营商成本叠加形成总成本函数,以系统总成本最小为目标构建运行周期优化模型,并基于遗传算法设计求解算法。通过多组仿真试验表明,DRC最佳运行周期随接送乘客比例和取消预订乘客比例变化;取消预订乘客数越多,则周期越长;当乘客数一定时,运行周期越长,则总成本越大。 The optimization method of the running cycle is studied according to the charac- ters of passenger demand when the single-bus and double-cycle mode is adopted by DRC bus. Firstly, passenger demand characters are described by the six dimension array. Second- ly, the passenger utility function is rebuilt considering the uneven distribution of passengers and the cancel reservation and so on, and then the passenger and operator total cost function is built. The optimization model of the running cycle is set up where the passenger departure time window requirement, vehicle capacity, etc. are all considered as conditions while the minimum total cost is the target. The genetic algorithm is devised to obtain the best period. A set of experiment are carried out. From these experiments, the best DRC operating cycle changes with the proportion of passengers and cancellation of booking passengers, the more passengers cancel the reservations, the longer the cycle length. And under the same passen- ger number, the longer the total operating cycle length, the greater the total cost.
出处 《长沙理工大学学报(自然科学版)》 CAS 2016年第2期19-25,共7页 Journal of Changsha University of Science and Technology:Natural Science
基金 国家自然科学基金资助项目(51278068) 国家自然科学基金重点资助项目(51338002)
关键词 交通工程 运行周期 调度 DRC 需求特征 traffic engineering operation cycle scheduling DRC demand characters
  • 相关文献

参考文献16

二级参考文献50

  • 1吴卫平,王东,季方,蔡莹娟,窦静雅.我国运输外部成本计算分析[J].铁道经济研究,2009(2):11-12. 被引量:10
  • 2陈国俊,杨晓光,刘好德,安健.基于动态百分位行程时间的公交到站时间预测模型[J].公路交通科技,2009(S1):102-106. 被引量:10
  • 3顾志兵,相伟,过秀成,屠福其.城乡公交统筹发展策略研究[J].公路交通科技,2006,23(5):114-117. 被引量:19
  • 4KLIEWER N, MELLOULI T, SUHL L. A Time-space Network Based Exact Optimization Model for Multi - depot Bus Scheduling [ J ]. European Journal of Operational Research, 2006, 175 (3): 1616-1627. 被引量:1
  • 5GINTNER V, KLIEWER N, SUHL L. Solving Large Multiple-depot Multiple-vehicle-type Bus Scheduling Problems in Practice [ J ]. OR Spectrum, 2005, 27 (4) : 507 - 523. 被引量:1
  • 6HAGHANI A, BANIHASHEMI M. Heuristic Approaches for Solving Large-scale bus Transit Vehicle Scheduling Problem with Route Time Constraints [ J ]. Transportation Research, 2002, 36 (4): 309-333. 被引量:1
  • 7WANG H, SHEN J. Heuristic Approaches for Solving Transit Vehicle Scheduling Problem with Route and Fueling Time Constraints [ J ]. Applied Mathematics and Computation, 2007, 190 (2): 1237-1249. 被引量:1
  • 8LI J Q, MIRCHANDANI P B, BORENSTEIN D. A Lagrangian Heuristic for the Real-time Vehicle Reseheduling Problem [ J]. Transportation Research Part E, 2009, 45 (3): 419-433. 被引量:1
  • 9HUISMAN D, ALBERT P M. A Solution Approach for Dynamic Vehicle and Crew Scheduling [ J ]. European Journal of Operational Research, 2006, 172 (2): 453 - 471. 被引量:1
  • 10LI J Q, HEAD K L. Sustainability Provisions in the Bus- scheduling Problem [ Jl. Transportation Research Part D, 2009, 14 (1): 50-60. 被引量:1

共引文献54

同被引文献15

引证文献3

二级引证文献30

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部