摘要
文章结合1250m3高炉煤气干法除尘及气力输灰系统运行实践情况,简述了高煤气干法除尘的工艺流程和输灰系统流程。探讨了系统需进一步完善提高的技术,拟为输灰系统的优化设计和应用提供借鉴。
The technological processes of dry dust removal for blast furnace gas and dust conveying system were elaborated based on the operational practice of the 1250m3 BF in Yangchun new steel. The technology that needs to be further developed in the system was also discussed,aiming to provide a reference for the optimal design and application of the dust conveying system.
出处
《冶金能源》
2016年第3期61-64,共4页
Energy For Metallurgical Industry
关键词
高炉煤气
干法除尘
输灰系统
卸灰阀门
blast furnace gas
dry dust removal
dust conveying system
cinder valve