结合工程实例,从对拉螺栓孔清理、砂浆拌制、上料、插捣、封口等方面,介绍了剪力墙结构大模板洞眼新型封堵技术,并总结了施工质控与环保措施,指出该新型封堵技术既提高了施工效率,又节约了施工成本。
Combining with the engineering example,from the opposite-pull bolt hole cleaning,slurry mixing,feeding,tamping,sealing and other aspects,this paper introduced the big template eye new plugging technology of shear wall structure,and summarized the construction quality control and environmental protection measures,pointed out that the new sealing technology could not only improve the construction efficiency,also saved the construction cost.