摘要
广东一次能源匮乏,发展核电是保证广东能源供应安全的必然选择。预计2020年,广东在运核电机组总容量约30000MW。根据负荷预测及电源发展规划,进行调峰平衡分析,预计2015年、2020年均存在一定的调峰缺口。结合核电机组参与调峰的可行性和必要性分析,预计2015年核电机组需参与周调峰,2020年需参与日调峰。
Guangdong is lack of primary energy,and the development of nuclear power plants is an inevitable choice for the security of energy supply.It is estimated that the installed capacity of nuclear power plants in Guangdong will be about 30000MW by the year of 2020.Based on Power System Planning,a peaking balance analysis is conducted.The result reveals that there is peaking gap both in 2015 and 2020.After a detailed discussion of the load following ability of nuclear power plants,the conclusion is reached that nuclear power plants will participate peak load regulation by week in 2015 and day by day in 2020.
出处
《电力技术》
2010年第Z2期82-85,81,共5页
Electric Power Standarization & Construction Cost Control Information