变截面人工挖孔桩在桩端为强风化岩时的设计探讨

Discussion on design of variable section manually excavated pile with strongly weathered rock at the pile end
下载PDF
导出
摘要 大直径人工挖孔扩底桩在高层建筑中已被广泛应用,但当桩端为强风化岩时,再在桩端扩大头,存在诸多弊端。基于变截面桩的受力机理和试验资料分析,提出了采用变截面人工挖孔桩的方案,相比于传统的桩端扩底挖孔桩,变截面挖孔桩具有施工安全、质量可靠、经济合理的优点。 Large diameter manually excavated pile has been widely applied in high rise buildings, but when the pile end is of strong weathered rock, the expanded head of the pile base has many defects. Based on the stress mecha- nism of the variable section pile and test data analysis, the scheme of variable section manually excavated pile was proposed, compared with the traditional manually excavated pile with expanded tip base, the variable section manually excavated pile has such advantages as safety construction, reliable quality and reasonable economy.
作者 杨同新
出处 《工程建设》 2016年第2期20-24,共5页 Engineering Construction
关键词 人工挖孔桩 变截面 桩端 强风化岩 设计 manually excavated pile variable section pile end strong weathered rock design
  • 相关文献

参考文献5

二级参考文献4

共引文献1151

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部