摘要
介绍了安萨尔多法国公司SEI和西门子公司SIMIS-W联锁列控一体化系统的技术特点;针对CTCS-2/CTCS-3级列控系统中的列控中心和车站联锁设备,总结出列控联锁一体化系统的设计原则并提供了实现方法。
The technical features of two kinds of imported integrated train control systems, SEI form French Ansaldo company and SIMIS-W form Siemens company, are introduced. Aiming at train control center equipment, or TCC for short, and computer based interlocking equipment, or CBI for short, in the CTCS Level 2 and level 3 train control system, the design principle of inte- grated system with CBI and TCC and the implementation method is provided.
出处
《铁道通信信号》
2016年第3期1-3,共3页
Railway Signalling & Communication
基金
中国铁路总公司科技研究开发计划重大课题:列控系统架构优化与信息传输技术研究--列控系统架构优化技术研究2013X001-A-1