简述了高边坡防护处理的基本方法,通过边坡的稳定分析评价,介绍了台山核电淡水水源工程由锚杆混凝土护坡结合框格草坡护坡改为三维植被网植草支护的过程,并详述了锚杆混凝土护坡、三维植被网植草支护施工技术。通过高边坡全过程评价,证明三维植被网植草支护结合锚杆混凝土护坡在高边坡运用的可行性。
The article briefly describes the basic method of protecting and treating high slope.According to the analysis and assessment of slope stability,the article introduces the process of changing the anchor bolt concrete slope protection with sash grass slope protection into 3-D vegetation net grass support for Taishan Nuclear Power Freshwater Source Project,and describes the construction technologies of anchor bolt concrete slope protection and 3-D vegetation net grass support Based on assessment of whole high slope process,the article proves the feasibility of 3-D vegetation net grass support with anchor bolt concrete slope protection to be applied in the high slope.
出处
《城市道桥与防洪》
2016年第4期176-177,184,共3页
Urban Roads Bridges & Flood Control
关键词
高边坡
三维植被网植草支护
锚杆混凝土护坡
应用
high slope
3-D vegetation net grass support
anchor bolt concrete slope protection
application