摘要
比较大桥船舶撞击风险评估各代表性模型,采用《美国公路桥梁设计规范(AASHTO)》船舶撞击风险评估方法对合江长江二桥船舶撞击桥墩进行风险评估,根据评估结果进行风险决策,建议采取有效的防撞构造措施,以降低或避免碰撞风险发生的可能。
The article compares various representative models of ship collision risk assessment. The ship collision risk assessment method of Code for Design of Highway Bridge in USA(AASHTO) is used to assess the risk of ship – pier collision in Hejiang Changjiang River Bridge II. Based on the assessment result, the risk decision is made and the effective anti-collision construction measures are proposed to take in order to reduce or avoid the possibility of collision risk.
出处
《城市道桥与防洪》
2016年第2期111-113,共3页
Urban Roads Bridges & Flood Control
关键词
合江长江二桥
船舶撞击
风险评估
风险决策
Hejiang Changjiang River Bridge Ⅱ
ship collision
risk assessment
risk decision making