摘要
以某污水处理厂地下箱体基坑工程为例,针对该工程地下箱体整体开挖的要求,从支撑的设置、连接及基坑施工工序的安排等方面,阐述了软土深基坑工程中复杂挖深条件下的支撑设计方法,为类似工程的支撑竖向设计提供了参考借鉴。
Taking the underground box foundation engineering of the sewage plant as an example,in light of its integral box excavation demands,starting from aspects of bearing setting,connection and foundation construction procedures arrangement,the article describes the bearing design methods of soft foundation engineering under complicated excavation condition,which has provided some guidance for similar vertical bearing design of the engineering.