期刊文献+

浅析立体交通隧道长度界定对工程预算的影响

Analysis on the Impact on the Project Budget by the Three-dimensional Traffic Tunnel Length Demarcation
下载PDF
导出
摘要 随着铁路建设的发展,在立体交通隧道工程建设中,如何界定所建联络线隧道长度,选用与之相匹配的工程预算定额条目编制预算,此文以成渝客运专线新中梁山隧道工程项目为例,探讨与其配套的3条联络线隧道长度的界定方法,以及以界定的隧道长度选用与之匹配的预算定额条目编制预算,并分析对工程投资的影响程度。 With the development of railway construction, how to define the link proposed tunnel length in the construetion of three -dimensional traffic tunnel project, choose the matching engineering budget quota entries to budgeting. This article use liangshan tunnel project of chengdu - chongqing expressway passenger dedicated line as an example, discussing the tunnel length determination method of three matching link, and the chosen of budget quota entries matching the tunnel length demarcation, and analyzed the influence degree of engineering investment.
作者 井纪均
出处 《铁路工程造价管理》 2016年第1期37-40,共4页 Railway Engineering Cost Management
关键词 铁路工程 立体交通 隧道长度 界定 预算 Railway engineering Three - dimensional transportation Tunnel length Demarcation Budgeting
  • 相关文献

参考文献2

  • 1铁建设[20101223号,铁路路基工程预算定额等二十九项定额标准[S]. 被引量:1
  • 2铁建设[2004]47号,铁路路基隧道工程预算定额[s]. 被引量:1

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部