惯性约束核聚变激光驱动器多路光束时间同步测试方法 被引量:6

Multi-Beams Time-Synchronization Measurement for Intertial Confinement Fusion Laser Facility
原文传递
导出
摘要 提出了一种测量惯性约束核聚变(ICF)激光驱动器靶点处多路光束时间同步的方法。首先测量参考光路脉冲到达靶点与到达基准点之间的时间间隔,然后测量待测光路脉冲到达靶点与参考光路脉冲到达基准点之间的时间间隔,计算得出待测光路脉冲与参考光路脉冲到达同一靶点的同步时间差。分析结果表明多束激光束间时间同步测量精度小于25.2 ps,测试技术和方法具有简单高效的特点,已成功应用于ICF激光驱动器多路强激光时间同步精密诊断。 A method measuring timing synchronization of multi-beams laser for intertial confinement fusion (ICF) facility is proposed. Firstly, the time interval of reference laser beam arriving criterion point and target point is measured. Secondly, the time interval of reference laser beam arriving criterion point and measured laser beam arriving target point is measured, the D-value between these two intervals stand for the time synchronization difference between reference beam and measured beam arriving the same target point. The analysis shows that the precision of this method is 25.2 ps.The measurement technology is simple and efficient, and it has been successfully applied in the synchronization measurement of ICF laser facility.
出处 《中国激光》 EI CAS CSCD 北大核心 2016年第2期196-200,共5页 Chinese Journal of Lasers
基金 国家自然科学基金(61377102)
关键词 测量 时间同步 靶点 示波器 光电管 多束激光 measurement timing-synchronization target point oscilloscope phototube multi-beams
  • 相关文献

参考文献10

二级参考文献53

  • 1赵东峰,华能,章亚男,李朝东,戴亚平,孙麟治,朱健强.“神光-Ⅱ”装置第九路靶场终端光学组件的研制[J].强激光与粒子束,2007,19(2):245-248. 被引量:9
  • 2冯斌,周忆,张军伟,彭万彬.大型精密镜架地面随机微振动响应分析[J].光学精密工程,2007,15(3):356-361. 被引量:16
  • 3彭志涛 孙志红 刘华等.基于光栅取样的靶场激光参数诊断技术研究.中国激光,2009,36(1):280-282. 被引量:2
  • 4FOLEY R J, KARPENDO V P, ADAMS C H, et al: Design of the Target Area .for the National Ignition Facility ER. Livermore: Lawrence Liver- more National Laboratory, 1996. 被引量:1
  • 5TRUMMER D J, FOLEY R J, SHAW G S. Sta- bility of Optical Elements in the NIF Target Area Building E R1. Livermore: Lawrence Livermore National Laboratory, 1998. 被引量:1
  • 6MOSES E I, CAMPBELL J H, STOLZ C J, et al: The National Ignition Facility = The World's Largest Optics and Laser System [-R. I.ivermore= Lawrence Livermore National Laboratory, 2003. 被引量:1
  • 7SAWICHI R H. The National Ignition Facility: la- ser system, beam line design and construction C. Proc. of SPIE, Bellingham, WA: SPIE, 2004, 5341: 43-54. 被引量:1
  • 8LARSON D W. NIF Laser Line-Replaceable Units (LRUs) [C]. Proc. of SPIE, Bellingham, WA: SPIE, 2004,5341: 127-136. 被引量:1
  • 9B()NANNO R E. Assembling and Installing LRUs for NIF [C]. Proc. of SPIE, Bellingham, WA: SPIE, 2004, 5341: 137-145. 被引量:1
  • 10ANDRE M L. The French Megajoule Laser Project (LMJ) [J]. Fusion Eng. and Des., 1999, 44: 43- 49. 被引量:1

共引文献30

同被引文献64

引证文献6

二级引证文献29

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部