期刊文献+

高含水老油田注采连通判别及注水量优化方法 被引量:8

Injector-producer connectivity identification and water injection optimization of mature oil fields in high water cut period
下载PDF
导出
摘要 探讨注采连通关系及注水量合理利用的问题。鉴于当前描述注采连通关系、优化注水量的电容电阻模型未考虑生产井间干扰和注采井合理影响范围,通过引入生产井间干扰因子和注采井影响系数矩阵对其进行改进。改进后的注采连通新模型判别注采动态连通性,并通过构建注水效率与连通系数的关系式,提出一种注水量优化调整新方法。从连通系数和注水效率2方面对新方法的可靠性进行验证,并在冀东油田高5断块进行应用。研究结果表明:与现有方法相比,新方法计算结果与生产实际数据更接近,历史拟合时间短,快捷省时,只需要现场的地面生产数据,基本数据较易获取。 The rational utilization of water injection and connectivity relationships between injectors and producers were discussed. Considering that the widely used CRM(capacitance resistance model), which could estimate connectivity relations and optimize water injection efficiency, did not take into account the reasonable influence radius and inter-well interference between producers, modifications were made about the basic CRM by introducing interference constant and influence coefficient matrix. Based on calculated results of revised CRM and the new purposed expression between water injection efficiency and connectivity coefficients, a new approach for optimal adjustment of water injection was presented. Credibility and usability of the new method were verified from connectivity coefficient and water injection efficiency. The new method was preliminarily applied in GAO5 fault block of Jidong Oilfield. The results show that compared with the existing methods, the new method has the following advantages: the results are closer to actual production results; history matching is fast and timesaving; the field production data are the basic data which are easy to be obtained.
出处 《中南大学学报(自然科学版)》 EI CAS CSCD 北大核心 2015年第12期4592-4601,共10页 Journal of Central South University:Science and Technology
基金 国家科技重大专项(2011ZX05010-002)~~
关键词 电容电阻模型 注水驱油效率 注采连通性 注水量优化 井间干扰 CRM(capacitance resistance model) water flood efficiency injector-producer connectivity water injection optimization inter-well interference
  • 相关文献

参考文献20

  • 1Batycky R,Thiele M,Baker R,et al.Revisiting reservoir flood-surveillance methods using streamlines[J].Spe Reservoir Evaluation & Engineering,2005,11(2):387-394. 被引量:1
  • 2Thiele M R,Batycky R P.Using streamline-derived injection efficiencies for improved waterflood management[J].Society of Petroleum Engineers,2006,9(2):187-196. 被引量:1
  • 3Thiele M R,Batycky R P,Fenwick D H.Streamline simulation for modem reservoir-engineering workflows[J].Journal of Petroleum Technology,2010,62(1):64-70. 被引量:1
  • 4Al-Najem A A,Siddiqui S.Soliman M.Streamline simulation technology:Evolution and recent trends[C]//SPE Saudi Arabia Section Technical Symposium and Exhibition.Al-Khobar:Society of Petroleum Engineers,2012:938-960. 被引量:1
  • 5Albertoni A,Lake L W.Inferring interwell connectivity only from well-rate fluctuations in water floods[J].Spe Reservoir Evaluation & Engineering,2003,6(1):6-16. 被引量:1
  • 6Gentil P H.The use of multilinear regression models in patterned waterfloods:Physical meaning of the regression coefficients[D].Austin:The University of Texas at Austin,2005:82-99. 被引量:1
  • 7Yousef A A,Gentil P H,Jensen J L,et al.A capacitance model to infer interwell connectivity form production and injection rate fluctuations[J].Spe Reservoir Evaluation & Engineering,2006,9(6):630-646. 被引量:1
  • 8Lake L W,Liang Xs Edgar T F,et al.Optimization of oil production in a reservoir based on capacitance model of production and injection rates[C]//Hydrocarbon Economics & Evaluation Symposium,2007:323-345. 被引量:1
  • 9Sayarpour M,Zuluaga E,Kabir C S,et al.The use of capacitance-resistive models for rapid estimation of waterflood performance and optimization[J].Journal of Petroleum Science and Engineering,2009,69(3/4):227-238. 被引量:1
  • 10Sayarpour M.Development and application of capacitance-resistive models in water/CO2 floods[D].Austin:The University of Texas at Austin,2008:22-60. 被引量:1

二级参考文献30

共引文献73

同被引文献124

引证文献8

二级引证文献37

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部