基于邻域渲染的二车间综合调度算法 被引量:4

Integrated Scheduling Algorithm of Two Workshops Based on the Principle of the Neighborhood Rendering
下载PDF
导出
摘要 针对如何将复杂产品工序有效地分配到具有相同设备资源的两车间加工的问题,提出了基于邻域渲染的二车间综合调度算法。该算法为了实现产品加工尽早结束,提出关键设备均衡策略,将关键设备上的所有加工工序预先按并行加工时间最长方案均衡的分配到二车间;为了减少两车间之间的迁移次数,提出邻域渲染策略和同设备工序车间选择策略,通过计算未分配加工车间工序的邻域加工工序的渲染因子和影响因子确定其所在的加工车间;为了提高调度效率,采用动态关键路径策略和短用时策略确定工序调度次序,按序确定工序的加工车间和开始加工时间。分析和实例表明,所提出的算法产品加工时间较短、工序迁移次数较少且不增加算法复杂度。 Aiming at that the problem that how to allocate complex product procedures effectively to two workshops with the same equipment resources, integrated scheduling algorithm of two workshops based on neighborhood rendering is proposed. In order to let two workshops products completed as soon as possible, this algorithm proposes critical-equipment equilibrium strategy, prior allocated procedures of key-equipment balanced to two workshops in accordance with the longest parallel processing scheme. In order to reduce the number of procedures transfer between two workshops, the strategy is put forward based on neighborhood rendering and the strategy to select workshop for the same equipment procedure. By calculating the rendering factor and the influence factor of the neighborhood procedure, other unallocated processing workshops are determined. In order to improve the scheduling efficiency, the strategy of dynamic critical path and short-time strategy to determine the scheduling sequence are adopted, then makes sure the processing workshops and start time. Analysis and instance show that the implementation of algorithm achieve the product in the shorter processing time and the less procedures migration times and not increase the algorithm complexity.
出处 《机械工程学报》 EI CAS CSCD 北大核心 2016年第1期149-159,共11页 Journal of Mechanical Engineering
基金 国家自然科学基金(60873019 61370086 61370083) 黑龙江省自然科学基金(F201101) 黑龙江省教育厅科技(12531105) 黑龙江省博士后科研启动(LBH-Q13092) 现代制造技术与刀具开发黑龙江省高校重点实验室开放课题(2012DJ-003) 全国高等学校计算机教育研究会(研究生创新)(ER2014018)资助项目
关键词 关键设备均衡策略 邻域渲染策略 同设备工序车间选择策略 影响因子 二车间综合调度算法 critical equipment equilibrium strategy neighborhood rendering strategy the same equipment process select workshops strategy influence factor integrated scheduling algorithm of two workshops
  • 相关文献

参考文献17

二级参考文献174

共引文献213

同被引文献49

引证文献4

二级引证文献14

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部