摘要 资源中断是项目实施过程中一种常见现象,它会导致项目进度计划的变更并引起额外的成本。本文研究资源随机中断下的项目调度问题,目标是对基准进度计划进行合理的调整,以最小化由此所造成的额外成本。作者首先对研究问题进行界定,随后构建问题的优化模型。针对模型的NP-hard属性,设计禁忌搜索启发式算法。最后以基准列表算法和随机生成算法为参照,在随机生成的标准算例集合上对算法进行测试,得到如下结论:在可接受的计算时间范围内,禁忌搜索获得的满意解质量明显高于其他两种启发式算法;算法的平均计算时间随着项目活动数的增加而增加,随着网络复杂度、资源强度或资源中断次数的增加而减小;满意解的平均目标函数值,随着项目活动数或网络复杂度的增加而增加,随着资源中断次数的增加而减小,与资源强度无明显关系。 Resource breakdown occurs frequently during the implementation of projects. It may lead to the changes of project schedule and generate additional expenses. This paper involves the project scheduling problem under resource breakdown, where the objective is to adjust the baseline schedule reasonably so as to minimize the incurred additional expenses. The problem is identified at first and the optimization model is constructed accordingly. For the NP-hardness of the problem, a tabu search heuristic algorithm is developed. Finally, given the baseline list algorithm and the random generation algorithm as comparison, we test the tabu search algorithm on a set of standard instances generated randomly. The conclusions are drawn as follows. First, within the acceptable computation time, the quality of the desirable solutions obtained by the tabu search heuristic algorithm is significantly better than those obtained by other two heuristic algorithms. Second, the average computation time increases with the activity number, but decreases with the network complexity, the renewable resource strength, and the number of resource breakdown, respectively. Third, the mean of objective function value also climbs with the activity number and drops with the network complexity and the number of resource breakdown, but it seems that there is no significance influence on the renewable resource strength.
出处 《运筹与管理》 CSSCI CSCD 北大核心 2015年第6期44-50,共7页 Operations Research and Management Science
基金 国家自然科学基金资助项目(70971105 71371150) 新世纪优秀人才支持计划资助项目(NCET-13-0460)
关键词 反应性项目调度 优化模型 禁忌搜索 资源随机中断 reactive project scheduling optimization model tabu search stochastic resource breakdown
  • 相关文献

参考文献16

  • 1庞南生,孟俊姣.多目标资源受限项目鲁棒调度研究[J].运筹与管理,2012,21(3):27-32. 被引量:13
  • 2Herroelen W, Leus R. Project scheduling under uncertainty: survey and research potentials [ J ]. European Journal ofOperational Research,2005,165(2) ; 289-306. 被引量:1
  • 3Vonder S V D , Demeulemeester E , Herroelen W. A classification of predictive-reactive project scheduling procedures [ J ].Journal of Scheduling, 2007, 10: 195-207. 被引量:1
  • 4Vonder S V D, Ballestin F, Demeulemeester E, Herroelen W. Heuristic procedures for reactive project scheduling [ J ].Computers & Industrial Engineering, 2007,52: 11-28. 被引量:1
  • 5Deblaere F, Demeulemeester E,Herroelen W , Vonder S V D. Robust resource allocation decisions in resource-constrainedprojects[ J]. Decision Sciences, 2007 , 38 (1 ) : 5-34. 被引量:1
  • 6Lambrechts 0,Demeulemeester E, Herroelen W. Proactive and reactive strategies for resource-constrained project schedulingwith uncertain resource availabilities[ J]. Journal of Scheduling, 2008 , 11 : 121-136. 被引量:1
  • 7Deblaere F,Demeulemeester E, Herroelen W. Reactive scheduling in the multi-mode RCPSP[ J]. Computers & OperationsResearch, 2011,38: 63-74. 被引量:1
  • 8任世科,袁治平,徐渝.突发事件应急救援动态调度优化:以KX井喷事故为例[J].运筹与管理,2012,21(3):1-7. 被引量:12
  • 9Mehta S, Uzsoy R. Predictive scheduling of a job shop subject to breakdowns [ J]. IEEE Transactions on Robotics andAutomation, 1998, 14: 365-378. 被引量:1
  • 10Mehta S, Uzsoy R. Predictive scheduling of a single machine subject to breakdowns[ J]. International Journal of ComputerIntegrated Manufacturing, 1999 ( 12: 15-38. 被引量:1

二级参考文献26

  • 1曹杰,杨晓光,汪寿阳.突发公共事件应急管理研究中的重要科学问题[J].公共管理学报,2007,4(2):84-93. 被引量:105
  • 2中国石油天然气集团公司工程技术与市场部,石油工程技术承包商协会.井喷事故案例汇编[M].北京:石油工业出版社,2006:4-190. 被引量:4
  • 3Herroelen W, Leus R. The construction of stable project baseline schedules[ J]. European Journal of Operational Research, 2004, 156(3) : 550-565. 被引量:1
  • 4Lambrechts O, Demeulemeester E, Herroelen W. A tabu search procedure for developing robusl predictive pro ieet schedule [ J]. International Journal of Production Economics, 2008, 111 (2) : 493-508. 被引量:1
  • 5Vonder S V D, Demeulemeester E, Herroelen W. Proactive heuristic procedures for robust project scheduling: an experimental analysis[ J ]. European Journal of Operational Research, 2008, 189 ( 3 ) : 723-733. 被引量:1
  • 6Yonder S V D, Ballestin F, Demeulemeester E, Herroelen W. Heuristic procedures for reactive project scheduling[ J]. Com- puters & Industrial Engineering, 2007, 52 ( 1 ) : 11-28. 被引量:1
  • 7Deblaere F, Demeulemeester E, Herroelen W. Reactive project scheduling in the multi -mode RCPSP[ J]. Computers & Op- erations Research, 2011, 38 ( 1 ) : 63-74. 被引量:1
  • 8Elmaghraby S. Activity nets: a guided tour through some recent developments[ J]. European Journal of Operational Re- search, 1995, 82(3): 383-408. 被引量:1
  • 9Blazewicz J, Lenstra J K, Rinnooy K A H G. Scheduling subject to resource constraints: classification and complexity[J]. Discrete Applied Mathematics, 1983, 5 ( 1 ) : 11-24. 被引量:1
  • 10Mika M, Waligora G, Weglarz J. Simulated annealing and tabu search for multi - mode resource-constrained project schedu- ling with positive discounted cash flows and different payment models[ J]. European Journal of Operational Research, 2005, 164(3) : 639-668. 被引量:1

共引文献23

同被引文献25

引证文献6

二级引证文献6

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部