摘要 2014年上海投运的220kV沈砖变电站为国网公司2014年标准装配式智能变电站模块化建设第一批试点工程,对二次设备室内二次屏柜按功能进行研究,并进行模块化分割,将其分为多个不同模块研究二次组合设备模块的最优化配置。总结220kV标准装配式变电站二次设备模块化实施的优缺点,并提出了今后需继续研究的问题。 The 220 kV Shen-zhuan Substation put into operation in Shanghai in 2014 is the SGC first batch of pilot project for modularization construction of standardly assembled intelligent substations.This project researched the interior secondary screen cabinets of secondary equipment according to the functions and made the modular division to study the optimization configuration of the secondary equipment module.The advantages and disadvantages of modularization implementation are summarized and the research direction to be continued in the future is suggested.
出处 《电力与能源》 2015年第6期797-800,共4页 Power & Energy
关键词 标准装配式 模块化 变电站 standard assembly modularization substation
  • 相关文献

参考文献5

二级参考文献7

共引文献23

同被引文献15

引证文献2

二级引证文献6

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部