摘要 葛洲坝电站利用机组水轮机改造增容的契机,对4号机组的上导轴承结构进行改造换型,将原来的抗重螺栓结构改造为可调楔子板球面支柱式结构,使用该结构是根据国内外大、中型电站机组的运行情况综合评估的结果。改造完成后,上导轴承瓦温及各工况下的上导摆度均在技术要求范围之内,试验过程中各部位振动正常,总体运行良好,提高了机组运行的可靠性和稳定性。 During the capacity expansion upgrading of hydro-turbine units in Gezhouba Hydropower Station , a renovation on the upper guide bearing in the No .4 unit is also carried out , in which the original gravity resistant bolt structure is re-placed by an adjustable wedge plate spherical support structure .This type of bearing structure is widely adopted in large to medium size units worldwide .After the renovation , the unit operates well as the bearing temperature and swinging of the upper guide bearing under various operation conditions are in the range of technical requirements and vibration of each part of the unit is normal .Also, the reliability and stability of the unit are improved .
出处 《水电与新能源》 2015年第12期57-59,65,共4页 Hydropower and New Energy
关键词 楔子板 上导轴承 间隙调整 机组运行 wedge plate upper guide bearing gap adjustment operation of generator unit
  • 相关文献

参考文献6

二级参考文献4

  • 1GB8564-1988,水轮发电机组安装技术规范[S]. 被引量:3
  • 2袁蕊,田字勤.水轮机检修[M].北京:中国电力出版社,2003. 被引量:4
  • 3刘大恺.水轮机[M].北京:中国水利水电出版社,1980 被引量:4
  • 4陈造奎.水利机组安装与检修:第三版[M].北京:中国水利水电出版社.2002. 被引量:1

共引文献11

同被引文献23

引证文献3

二级引证文献3

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部