2National BIM Standards Committee. About the National BIM Standard [EB/OL]. http: //www.buildingsmarta lliance.org/index.php/nbims/about/, ( May 5, 2013 ). 被引量:1
4Forgues D, Iordanova I, Valdivesio F, et al. Rethinking the Cost Estimating Process through 5D BIM: A Case Study[C]. //Construction Research Congress 2012@ Construction Challenges in a Flat World. ASCE, 2012: 778-786. 被引量:1
5Lei Z, Weifang Y. BIM technology of computer aided architectural design and green architecture design[C].//Robotics and Applications ( ISRA ), 2012 IEEE Symposium on. IEEE, 2012: 797-800. 被引量:1
6Wu W, Issa R A. Leveraging Cloud-BIM for LEED Automation[J]. ITCon, 2012, 17: 367-384. 被引量:1
7Zhang J P, Hu Z Z. BIM-and 4D-based integrated solution of analysis and management for conflicts and structural safety problems during construction: l. Principles and methodologies[J]. Automation in construction, 2011, 20 (2): 155-166. 被引量:1
8Julian K, Ganapathi Subramanian A, Lee J, et al. Robotic total station and BIM for quality control[C]. Proceedings of the 5th European Conference on Product and Process Modeling in the Building and Construction Industry, 2012: 717-722. 被引量:1
9Sun C, Jiang F, Jiang S. Research on RFID Applications in Construction Industry[J]. Journal of Networks, 2013, 8 (5): 1221-1228. 被引量:1
10Chuang T H, Lee B C, Wu I C. Applying cloud computing technology to BIM visualization and manipulation[C]. //28th International Symposium on Automation and Robotics in Construction. 2011: 144-149. 被引量:1