高扬程大管径输水管道水锤防护方案及成果比较分析

Comparative Analysis on Water Hammer Prevention and Results in High-lift and Large Diameter Water Transmission Pipeline
下载PDF
导出
摘要 文章根据我公司宁东能源重化工基地大型输水管道水锤防护工程实践,分析总结了采用单向调压塔和箱式双向调压塔进行水锤防护及实际情况,提出了大管径高扬程输水管道水锤防护及优化方案,供同类工程参考。 In the paper, according to the large pipes for water hammer protection engineering practice in our company's Ningdong energy heavy chemical base, analysis and summarize the water hammer protection and the actual situation of using one-way surge tower and box-type two-way surge tower, put forward the water hammer protection and the optimization solution in high-lift and large diameter water transmission pipeline, and it can be referenced for similar projects.
出处 《广东化工》 CAS 2015年第23期93-96,105,共5页 Guangdong Chemical Industry
关键词 调压塔 水锤防护 大管径 高扬程 surge tower water hammer protection largediameter high-lift
  • 相关文献

参考文献7

  • 1金锥等编著..停泵水锤及其防护 第2版[M].北京:中国建筑工业出版社,2004:346.
  • 2于必录,主编.《水力过渡过程》.武汉水力电力学院,1984,2. 被引量:1
  • 3中国市政工程东北设计研究院,长安大学主编.城镇供水长距离输水管(渠)道工程技术规程.中国计划出版社,2005. 被引量:1
  • 4[美]EB怀特,VL斯特里特.瞬变流.北京:水力电力出版社,1983. 被引量:1
  • 5刘竹溪,刘光临,等.泵站水锤及其防护.水利电力出版社,1985,6. 被引量:1
  • 6刘梅清,等.上海庙、红墩[能源化工基地供水]:程金水源泵站压力镑道水锤计算研究报告.武汉大学,2011,3. 被引量:1
  • 7杨玉思.宁夏宁东能源重化工基地输水工程长距离输水管线最佳运行工况和水锤防护方案计算分析.长安大学,2011,4. 被引量:2

共引文献1

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部