摘要
介绍了娘子关供水二期工程一级泵站沉井施工方案,对沉井施工中工艺流程、各施工工序的施工方法及质量要求进行了阐述。
The paper introduces the construction scheme of building the open caisson of the first stage pumping station of the Niangziguan Water Supply Second Phase Project,narrates the technological process of building the open caisson,the construction methods of every working procedure and the quality demand.
出处
《山西水利科技》
2015年第4期16-17,32,共3页
Shanxi Hydrotechnics
关键词
泵站
沉井
施工方案
pumping station
open caisson
construction scheme