期刊文献+

龙背湾水电站月牙肋钢岔管优化设计 被引量:4

Optimization Design of the Crescent Ribbed Steel Branch Pipe in Longbeiwan Hydropower Station
下载PDF
导出
摘要 针对龙背湾水电站的设计条件,综合分析选择受力条件好、水流平顺、水头损失小的月牙肋钢岔管方案,对龙背湾水电站对称Y形月牙肋钢岔管的布置、体形优化设计、有限元计算成果等进行了详细的论述,对水电站同类月牙肋钢管设计有一定的参考价值。 Considering the specific design conditions , the crescent ribbed steel branch pipe is adopted in Longbeiwan Hydropower Station due to its advantages such as the good stress condition , smooth water flow and small water head loss . The layout , profile optimization and finite element analysis results of the symmetric Y-shaped crescent ribbed steel branch pipe are presented , which should be of great use to the design of similar branch pipe in other projects .
出处 《水电与新能源》 2015年第11期6-12,共7页 Hydropower and New Energy
关键词 龙背湾水电站 月牙肋钢岔管 优化设计 Longbeiwan Hydropower Station crescent ribbed steel branch pipe optimization design
  • 相关文献

参考文献2

  • 1DL/T5141—2001,水电站压力钢管设计规范[S]. 被引量:1
  • 2DL5077-1997.水工建筑物荷载设计规范[S].[S].,.. 被引量:97

共引文献96

同被引文献33

引证文献4

二级引证文献31

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部