期刊文献+

生物地理学算法求解柔性车间作业调度问题 被引量:5

Biogeography-based optimization algorithm for flexible job-shop scheduling problems
下载PDF
导出
摘要 针对加工设备和操作工人双资源约束的柔性作业车间调度问题,建立以生产时间和生产成本为目标函数的柔性作业车间调度模型,提出基于模糊Pareto支配的生物地理学算法,采用模糊Pareto支配的方法计算解之间的支配关系并对Pareto解集排序,进行全局最优值的更新,并采用余弦迁移模型来改善生物地理学算法的收敛速度。将该方法应用于某模具车间的柔性作业车间调度中,仿真结果验证了该方法的可行性和有效性。 To solve the multi-objective problem in flexible job-shop scheduling considering the resource constraints of machines and operators, Fuzzy Pareto Dominance-Combined Biogeography-Based Optimization scheduling algorithm(FPDCBBO)is proposed. Using the method of fuzzy Pareto to calculate the dominant degree between the solutions and sorted, updating the global optimal value. Cosine migration model is used to improve the convergence speed of biogeography-based algorithm. Finally, the algorithm is applied in an actual production instances, the feasibility and efficiency of algorithm are verified.
出处 《计算机工程与应用》 CSCD 北大核心 2015年第22期206-213,242,共9页 Computer Engineering and Applications
基金 国家高技术研究发展计划(No.2013AA040405)
关键词 柔性作业车间调度 模糊Pareto支配 生物地理学算法 余弦迁移模型 双资源约束 flexible job-shop scheduling Fuzzy Pareto Dominance(FPD) Biogeography-Based Optimization algorithm(BBO) cosine migration model double resource constraints
  • 相关文献

参考文献22

二级参考文献93

共引文献71

同被引文献51

引证文献5

二级引证文献20

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部