9F燃气轮发电机穿转子技术 被引量:1

9F Gas Turbine Generator Rotor Mounting Technology
下载PDF
导出
摘要 因为现代9F燃机主厂房力能布置采用的都是厂家标准设计,燃气轮发电机上部只有1台10 t单梁起重机作为将来机组检修时燃气轮发电机的主力吊机,而发电机转子有53 t,正式起重机无法满足发电机穿转子的需求,所以,需要利用平台和门架完成穿转子工作。课题研究的应用技术主要是为了延长燃气轮发电机穿转子准备阶段的时间,保证穿转子工作能够安全、有序地完成。 Because modern 9F gas main power plant can be arranged are factory standard design used, only one gas turbine generator sets the upper 10 tons single girder crane when the crane as a future main gas turbine unit maintenance, and generator the rotor has 53 tons, formal wear generator mounted crane unable to meet the needs of the rotor, so need to use the platform and the rotor mast complete the work of rotor mounting. Application technology research is mainly to extend the gas turbine generator rotor wear dress preparation stage time to ensure that the work of rotor mounting can safe, orderly completion.
作者 徐彬
出处 《科技与创新》 2015年第22期157-157,159,共2页 Science and Technology & Innovation
关键词 9F燃气轮机 穿转子 专用平台 门架 9F gas turbine mounting rotor proprietary platforms mast
  • 相关文献

参考文献1

  • 1中国电力建设企业协会.DL5009.1-2002电力建设安全工作规程[S].北京:中国电力出版社,2003. 被引量:1

同被引文献7

引证文献1

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部