隧道施工测量及特殊地质条件下施工对策探讨 被引量:3

Survey of Tunnel Construction and The Discussion of Construction Countermeasures Under Special Geological Conditions
下载PDF
导出
摘要 隧道工程测量是地下工程测量的重要组成部分,它是在隧道工程的规划、勘测设计、施工建造和运营管理的各个阶段进行的测量,对地下工程的施工起着关键性作用。同时复杂的地质环境也将对隧道施工产生决定性的影响。本文以包西铁路冒天山隧道为例,详细描述隧道施工中洞外控制测量、洞内平面控制、中线及高程的控制测量以及贯通误差的计算方法,最后探讨特殊地质条件下隧道施工的对策。 Tunnel engineering surveying is an important part of underground engineering surveying,it isthe surveying at planning,survey design,construction and operation management of the tunnel engineering,It plays a key role to the construction of underground engineering.At the same time,A complex geological environment will also be a decisive influence on the tunnel construction.This article is as a case of Mao Tian-shan Tunnel in Bao-xi Railway,detailed control survey outside hole,plane control inside the hole,the control survey of mid-line and elevation and the calculation method of breakthrough error of the tunnel construction.And finally discusses the countermeasures of tunnel construction under special geological conditions.
出处 《北京测绘》 2015年第4期110-113,共4页 Beijing Surveying and Mapping
关键词 隧道 测量 特殊地质 对策 tunnel surveging special geological cuntermeasures
  • 相关文献

参考文献11

二级参考文献16

共引文献10

同被引文献13

引证文献3

二级引证文献2

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部