期刊文献+

塔吊基础与地下室底板合二为一设计与实践 被引量:9

Design and Practice of Tower Crane Foundation and Basement Floor Rolling into One
下载PDF
导出
摘要 现阶段建筑工程施工中塔吊基础承台大多数采用独立形式,对于高层建筑筏板基础而言,塔吊基础承台位于筏板之下,造成塔吊基础部位土方超挖,且造成了一定的钢筋混凝土浪费。结合一工程实例,对塔吊基础与地下室底板合二为一施工方案进行了设计,对该方案编制中注意事项、实践过程中存在的问题进行深入分析,为今后编制类似方案及规程提供参考。 The independent foundation form is mostly used in the pile caps of tower crane foundation in the engineering construction at this stage, for the raft foundation of tall building, the pile caps of tower crane foundation was located under the raft, which caused the earthwork overbreak of the tower crane foundation site, also has a waste of some reinforced concrete. Combined with an engineering example, we designed construction plan of the tower crane foundation and basement floor rolling into one, and analyzed the matters needing attention of the scheme establishment and the problems existing in the process, and provided reference for making similar plan and procedures.
出处 《工程质量》 2015年第10期63-66,共4页 Construction Quality
关键词 塔吊基础 地下室底板 防水 tower crane foundation the basement floor waterproof
  • 相关文献

参考文献3

  • 1中国建筑科学研究院.JGJ/T187-2009塔式起重机混凝土基础工程技术规程[S].北京:中国建筑工业出版社,2009. 被引量:2
  • 2中国建筑科学研究院.GB50007-2011建筑地基基础设计规范[s].北京:中国建筑工业出版社,2012. 被引量:1
  • 3中国建筑股份有限公司.建筑施工手册(第五版)[M].北京:中国建筑工业出版社,2012. 被引量:4

共引文献4

同被引文献32

引证文献9

二级引证文献11

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部