摘要
从施工导流、主体工程、施工布置、施工进度等方面介绍了雲露湖水库拦水坝施工组织设计的技术要点,可以为以后类似工程施工提供参考。
From the aspects of construction diversion, the main part of' the project, construction layout, construction- schedule etc,the article introduced the main technical points of the construction organization and design of barragein Yunluhu reservoir dam,which can provide reference for similar engineering construction in the future.
出处
《河南科技》
2015年第6期50-53,共4页
Henan Science and Technology
关键词
拦河坝
施工导流
施工布置
施工特点
barrage
construction diversion
construction layout
construction characteristics