船体分段建造可以缩短造船周期,提高生产效率。文章针对10500 DWT滚装船船艏部分分段建造的特点,按照建造流程给出了建造各阶段的检验要点,供相关人员参考。
Hull block construction can shorten shipbuilding cycle and improve production efficiency. Based on the characteristics of the bow sub-construction of 10500 DWT RORO, and in accordance with the construction process, the test points are given for each stage of construction, which can provide reference for the relevant personnel.