期刊文献+

秦山第二核电厂1&2号机组主蒸汽安全阀改进分析 被引量:2

Analysis of Main Steam Safety Valve Improvement for Qinshan Nuclear Power Plant Phase 2 Unit 1&2
下载PDF
导出
摘要 秦山第二核电厂1&2号机组拟将其加能助动式主蒸汽安全阀改为弹簧加载式安全阀。通过比对秦山第二核电厂3&4号机组主蒸汽安全阀设计,提出了1&2号机组主蒸汽安全阀改进方案,即第1组阀门采用弹簧加载式并调整开启整定值,并从机械设计、仪控设计和安全分析等方面论证了该方案的可行性。新的改进方案在保证安全的前提下,简化了设计,大幅减少了工程投入,同时降低了系统和控制逻辑复杂化后带来的潜在停堆风险的增加。 An improvement for Qinshan Nuclear Power Plant Phase 2 unit 1&2 ,in which the power‐operated valves are replaced with the spring‐loaded valve with setpoint adjustment for the 1st group safety valves of steam generators ,would be adpoted on the basis of comparison with similar improvement implemented in Qinshan Nuclear Power Plant Phase 2 unit 3&4 .The feasibility was evaluated from several aspects ,including mechanical design ,instrument & control design and safety analysis .On the premise of guaranteeing safety ,this improvement can simplify design ,observably reduce project costs and avoid increasing the potential probability of the reactor trip risk induced by complication of the system and control logic .
出处 《原子能科学技术》 EI CAS CSCD 北大核心 2015年第9期1655-1659,共5页 Atomic Energy Science and Technology
关键词 秦山第二核电厂 主蒸汽安全阀 改进 main steam safety valve improve-ment
  • 相关文献

参考文献2

  • 1法国电力公司,法马通公司.RCC-P900Mwe压水堆核电厂系统设计和建造规则(1995修订)[S].上海:上海科学技术文献出版社,2011. 被引量:1
  • 2核工业部上海核工程研究设计院.EJ339-1988压水堆核电厂安全阀和卸压阀管系设计准则[S].北京:中华人民共和国核工业部,1988. 被引量:1

同被引文献4

引证文献2

二级引证文献1

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部