在污水及自来水处理厂建设太阳能发电设施具有集约化用地、自发自用、用电负荷高、就地消纳、稳定性好、融资环境佳、可与水处理生产工艺完美结合等优点。鉴于水处理池体结构的特殊性,项目的结构设计是整个项目实施的难点,需要兼顾到经济投资、结构安全、水处理池运行调控以及实施的难易程度。详细分析了方案的施工可行性以及相关经济造价。
The construction of solar energy generation facilities in sewage and water treatment plants has the advantages of intensive use of land, self-generation for self-use, high power load, on-site use, good stability, favorable financing environment and perfect combination with the production technol- ogy of water treatment plants. Considering the structure particularity of sewage and water treatment tanks, the structural design of the project was the difficult point of the entire project implementation, which nee- ded to give consideration to economic investment, structural safety, regulation and control of sewage and water treatment tanks and the complexity of implementation. The construction feasibility of the scheme and relevant economic costs were analyzed.
出处
《中国给水排水》
CAS
CSCD
北大核心
2015年第18期90-94,共5页
China Water & Wastewater
关键词
可再生能源
水处理
太阳能发电
节能减排
循环再利用
renewable energy sources
sewage and water treatment
solar energy generation
energy saving and emission reduction
recycling