深基坑多支点桩锚支护结构锚点位置的优化 被引量:4

Anchor position optimization of deep excavation multi-pivot pile anchor structure
下载PDF
导出
摘要 在考虑基坑顶面荷载作用位置的情况下,从锚杆排列方式入手,结合工程实例,利用理正软件求得桩身最大位移,编制MATLAB程序,拟合出不同锚杆排列方式和不同的第一排锚杆支点位置对应的桩身最大位移的曲线函数,并用单纯形法计算出最优的锚杆间距和第一排锚杆的支点位置.提出深基坑多支点桩锚支护结构中支点的最佳分布形式. Taking into consideration the load application position on top of excavation pit and first of all the anchor arrangement, the maximum displacement of piles is found with Lizheng software for an actual practice, a MATLAB program is compiled to fit a curve function of the maximum displacement of piles corresponding to different anchor arrangement modes and different support location of the first-row anchor, and finally, the simplex method is used to calculate the optimal anchor spacing and the support location of the first-row anchors. An optimum distribution mode of pivot in deep-excavation multi-pivot pileanchor structure is put forward.
作者 周勇 王一鸣
出处 《兰州理工大学学报》 CAS 北大核心 2015年第4期121-125,共5页 Journal of Lanzhou University of Technology
基金 国家科技支撑计划资助项目(2011BAK12B07) 甘肃省自然科学基金(1208RJZA158) 甘肃省高等学校基本科研业务费资助项目
关键词 深基坑 支点分布 层次分析法 最大位移曲线函数 deep foundation pit pivot distribution hierarchy analysis method function of maximum displacement curve
  • 相关文献

参考文献12

二级参考文献24

共引文献885

同被引文献36

引证文献4

二级引证文献16

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部