根据西南某滑坡变形现状分区及稳定性计算分析,提出采用上部滑坡区钢管桩+裂缝封填+截排水沟,下部堆积区分流槽分流停淤的综合治理措施,通过全过程监测及治理竣工后汛期考验,指出应急治理工程取得了良好的治理效果,变形得到了有效控制。
According to southwestern landslide deformation distribution and stability computation analysis, the paper puts forward comprehensive processing measures of steel pipe pile + cracks sealing + drainage ditch of upper landslide region and shunt silt in lower accumulation area, carries out whole-process monitoring and completion examination during flood season, and finally points out that: the emergent treatment engineering achieves good treatment effect, the deformation is effectively controlled as well.
出处
《山西建筑》
2015年第25期82-83,共2页
Shanxi Architecture
关键词
高位滑坡
抢险治理
效果评价
high landslide, emergent treatment, effect evaluation