期刊文献+

“三软”地层快速掘进锚喷支护研究

A study on the rapid excavation of anchor and shotcrete support in "Three Soft" strata
下载PDF
导出
摘要 "三软"地层条件下,顶板是制约掘进机快速掘进的主要因素,通过采用"三掘三喷"施工工艺及劳动组织、加强质量管理,实现了掘进机快速掘进,保证了顶板安全。 Under the conditions of "Three Soft" strata, the roof safety is main factors restricted rapid excavation of the tunnel boring machine, used the "three driving and three shotcrete " construction technology and labor organization, strengthened quality management, effectively solved the problem, realized the rapid excavation of the tunnel, and ensured that the top plate is safe.
出处 《山东煤炭科技》 2015年第8期35-36,共2页 Shandong Coal Science and Technology
关键词 “三软”地层 锚喷支护 快速掘进 三掘三喷 安全 "three soft" strata bolt shotcrete support rapid tunneling three driving and three shotcrete safety
  • 相关文献

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部