摘要
通过简要介绍基础,阐述了施工需做好的准备工作,进而介绍了具体操作:先在岩石的原状结构上用专用机械打孔,打好孔后清渣、洗孔,然后在安放好锚孔用的钢筋、地脚螺栓后进行混凝土浇制。
Through a brief introduction of the foundation. In this paper, the construction is required to do the preparatory work, and introduces the concrete operation: first in the rock's original structure with special mechanical drilling, hole cleaning residue, cleaning the hole, then placed anchor hole to use reinforced, anchor bolts, after concrete pouring.
出处
《科技与创新》
2015年第16期80-82,共3页
Science and Technology & Innovation