结合港珠澳大桥沉管隧道内压载水箱和钢封门拆除转运、压舱混凝土浇筑、场地清理、通风、照明设施安装等各项施工的特点,探讨了隧道内施工安全管理工作要点,可为类似工程参考。
During the construction of the Hongkong-Zhuhai-Macao Bridge immersed tube tunnel, many works proceeded simultaneous, such as the demolition transport of ballast water tank and steel door, ballast concrete pouring, site clearance, ventilation, lighting installation and so on. Combined with the characteristics of the works, we discussed the key points of the safety management of construction in tunnel, which can provide references for similar projects.
出处
《中国港湾建设》
2015年第7期134-136,共3页
China Harbour Engineering
关键词
沉管隧道
安全管理
标准化
immersed tube tunnel
safety management
standardized