摘要
通过对锦州大兴隆山风力发电场一期工程项目主体工程的水土保持分析与评价,可以看出工程在布设和工程实施上,均符合对原地貌、土地及植被破坏较小,尽量控制水土流失到最低的原则,从保持水土和保护建设区生态环境的角度分析,整个项目选址和工程布局是合理的。
Project layout and project implementation are in line with the principles of low damage to original landform,soil and vegetation,and control of soil and water loss to the lowest level through the analysis and evaluation of soil and water conservation in stage I project main work of Jinzhou Daxinglong Mountain Wind Power Plant. The whole project site selection and project layout are rational by analyzing from the perspective of keeping water and soil,and protecting the ecological environment in the construction area.
出处
《中国水能及电气化》
2015年第7期63-66,共4页
China Water Power & Electrification
关键词
水土保持
主体工程
水土流失
分析与评价
soil and water conservation
main work
soil and water loss
analysis and evaluation