摘要
以某县集中供热工程主干线一次网直埋设计为例,通过现场踏勘,确立了管道的初步敷设方案,对水力、管网坐标、里程标注、摩擦力等进行了计算,分析了供热直埋敷设的设计要点,使设计符合规范标准。
Taking the primary network direct burial design along the trunk line of the centralized heat supply project of some county as the example, the paper identifies the pipeline initial installation scheme by the site survey, calculates the hydropower network coordinate, mileage mark, and friction, and analyzes the design points for the heat supply direct burying installation, so its design adheres to the regulation standard.
出处
《山西建筑》
2015年第21期111-113,共3页
Shanxi Architecture
关键词
供热工程
管道
计算
安装
heat supply project, pipeline, calculation, installation