摘要
本文介绍了沈阳市地铁二号线会展中心站的工程概况以及水文地质条件,分析其工程特点、地质特征,提出其基坑降水方案和降水施工需要注意问题。按该方案顺利完成该车站的基坑降水工作。
This paper introduced engineering general situation and the hydrogeological conditions in the study area and, analyzed the engineering characteristics, geological features, the falling groundwater level scheme and construction need to pay attention to the problem were put forward. According to the plan,successfully completed the foundation pit falling groundwater level work. According to the plan successfully completed the work station foundation pit precipitation.
出处
《吉林地质》
2015年第1期110-111,128,共3页
Jilin Geology
关键词
沈阳地铁
车站
基坑降水
Shenyang subway
metro station
foundation pit falling groundwater level